Asbestos Removal for the Construction (Residential) Sector - Shepherds Bush. Asbestos removal case study
Posted via Industry Today. Are you into it? Follow us on Twitter @IndustryToday
Client: Ayerst Environmental Ltd
Main Contractor: Balfour Beatty plc
Location: Charecroft Estate, Shepherds Bush, London
Contractor: Deconstruct UK Ltd Completion Date: May 2011
Sector: Construction (Residential)
Removal of asbestos containing materials from occupied high rise residential buildings in Shepherds Bush, London.
Over the course of 6 months Deconstruct teams were engaged in the removal of asbestos insulation board, duct cladding and wall panels throughout the residential tower blocks at the Charecroft Estate.
The cladding and panelling was typically located in kitchens and hallways, which meant that residents had to leave their properties for the day to enable tented enclosures to be constructed. Enclosures were formed, asbestos removed, enclosures tested and site cleared each day to allow the resident to return to a safe environment that same day.
The work was undertaken inside occupied flats containing resident's personal property so our works had to be carried out in a neat and tidy manner, ensuring that no damage was caused.
Our trusted teams of Operatives prepared the work areas with due consideration for the decoration within the properties. The asbestos removal operation had to be completed to exacting standards as there could be no risk of asbestos contamination into the property.
Download the full asbestos removal case study document for the residential sector here
For further information about our Asbestos Removal and Deconstruction services, please call us now on 020 7734 6655 or visit www.deconstructuk.com
REQUEST A CALL BACK NOW TO DISCUSS YOUR ASBESTOS REMOVAL PROJECT IN LONDON 020 7734 6655 or email enquiries@deconstructuk.com
Contact Information
Nicky Frost
SMPR
18 Generator Hall
Electric Wharf
Coventry
CV1 4JL