Deconstruct UK Ltd, provide a dependable single-stage solution encompassing all aspects of site enablement through to the construction phase of a project.
Posted via Industry Today. Are you into it? Follow us on Twitter @IndustryToday
Deconstruct contracted to remove escalators, travelators, lifts, podiums, and significant redundant plant from tourist attraction the Trocadero, London.
About the project:
Deconstruct offer a dependable single-stage solution encompassing all aspects of site enablement through to the construction phase of a project.
The client was preparing for a significant construction phase of development on this structure and required the removal of all plant and escalators from within the substantial central core area over 7 floors.
The Trocadero had famously been converted from the Sega Centre in 1994 and had created a substantial central atrium area where "Rocket" escalators travelled from ground to fourth floors, and travelators crossed the atrium at 5th and 6th floor.
To remove these escalators, significant design scaffold with fire retardant boards had to be installed.
Download our case study, to find out more about the challenges faced during the duration of this project.
About Deconstruct UK Ltd:
Operating from their Central London Headquarters, Deconstruct (UK) Asbestos Removal offer a London asbestos removal service in the Greater London area.
Deconstruct is a client focussed business that draws upon in excess of 50 years experience gained at the highest level within the asbestos removal contractors industry.
They will deliver your project safely, on time and on budget, offering the full range of asbestos abatement services to both the public and private sectors, predominantly within London, the South East and Home Counties.
Our full list of asbestos management services can be viewed here:
Subscribe to this blog by Email or to follow the RSS feed, click here.
REQUEST A CALL BACK NOW TO DISCUSS YOUR ASBESTOS REMOVAL PROJECT IN LONDON 020 7734 6655 or email enquiries@deconstructuk.com
Contact Information
Nicky Frost
18 Generator Hall
Electric Wharf
Coventry
CV1 4JL